ABB STRIEBEL & JOHN GmbH
Topic: Fast electrical installation in practice - perfect solutions from a single source
Tasks: 1. Install and connect the selective main circuit breaker S750 and surge protection OVR ZP in the new ComfortLine meter panel in the access.
2. Install selected DIN rail devices in the UK600 circuit distributor, equip them with the appropriate phase rails and connect them.
3. Convenient connection of Busch-flexTronics® thanks to the enlarged connection space.
4. Simply put Busch-flexTronics® into operation and control functions on the switching device or with your smartphone/tablet.
5. Pair the smartphone with the Busch-Radio BTconnect DAB and stream music from the smartphone to the radio and play it there. Pair the Busch-Radio BTconnect DAB with a BT speaker and play a radio station from the radio on the BT speaker.
6. Installing and connecting the module components of the individual Busch-Welcome® door outdoor station for 2-wire.
7. Configuration of the Busch-Welcome® door communication: Creating a project for a single-family home. Creating a project with the Smart Home Configurator for a 2-room apartment.
8. Fast and easy installation with SmissLine TP compared to classic DIN rail mounted devices in an existing electrical distribution system.
Performance level: 1st-3rd year of apprenticeship
Stand: W80
ABL GmbH
Topic: The perfect connection - SCHUKO high-tech plugs and couplings
Tasks: Making a SCHUKO extension cable
Performance level: 1st year of apprenticeship
Stand: W34
Albrecht Jung GmbH & Co.KG
Topic: JUNG HOME
Tasks: Installation & commissioning of the new Jung Home System
Stand: W82
Bals Elektrotechnik GmbH & Co.KG
Topic: Installation of a CEE connector 16A 5-pin with maintenance-free connection technology
Tasks: Stripping conductors,
Open the plug, pull in the cable, connect the conductors L1, L2, L3, N and PE. Screw the strain relief tight, test
Performance level: 1st year of apprenticeship
Stand: W62
BBC Cellpack GmbH
Topic: Installation of cable fittings in various low-voltage technologies
Tasks: Choice of: gel, connection, shrink technology, self-guided assembly, tools, cables, products are available
Performance level: 1st year of apprenticeship
Stand: W02
Federal Technology Center for Electrical and Information Technology
Topic: Experiencing e-mobility and e-norms differently
Tasks: The participant has the opportunity to drive the Carrera track on our stand. He is given the following task beforehand: Calculate the speed / kmh of the vehicle for one lap.
Performance level: 1st year of apprenticeship
Stand: W18
Cimco
Topic: Can you get the solar panel to work?
Tasks: Installation of a solar module with appropriate charging control. The focus of this application is on the MC4 plug connections that are used in almost all solar systems. To set up a plug connection, the correct use of a cable cutter, a stripping tool and a crimping tool is required. If all work is carried out correctly, the solar panel will work!
Performance level: 1st year of apprenticeship
Stand: W78
Gossen Metrawatt GmbH
Topic: VDE tests according to VDE 0100-600 and VDE 0701-0702
Tasks: Testing of mobile equipment, testing of fixed electrical installations
Performance level: 1st-3rd year of apprenticeship
Booth: W04
Günther Spelsberg GmbH & Co.KG
Topic: Quickly installed, safe charging - with the new Spelsberg Wallbox!
Tasks: 1. Connecting the charging cable to the wallbox
2. Configuration and commissioning of the Spelsberg Wallbox with the Spelsberg Wallbox app
Stand: W40
Hager Vertriebsgesellschaft mbH & Co. KG
Topic: Get to know Hager products and their safe and easy installation
Tasks: 1. Equipping and wiring a technical center according to the current application rules. 2. Installation of a changeover switch (with Berker W.1 IP55 and Berker Q.7) 3. Wiring and connecting Tehalit device sockets in tehalit BR65 and tehalit BRN65 4. Configuration of a building control system with domovea 5. Installation of an Elcom 2-wire video system for a two-family house
6. Fast and easy planning, from room book to small distribution board, with Hager Ready
Performance level: 1st-4th year of apprenticeship
Stand: W56 & W58
Gustav Hensel GmbH & Co. KG
Topic: Conductor cross-section determination with software tool
Task: Determination of cross-section taking into account the type of installation, disconnection conditions and voltage drop Selection of the appropriate cable junction box for the determined conductor cross-section
Performance level: 1st-3rd year of apprenticeship
Stand: W14
HellermannTyton GmbH
Topic: Cable entry VarioPlate corrugated pipes and holders
Cable Pulling Aid Cable Scout
Tasks: Assemble a frame of the VarioPlate cable entry system Print labels TT431 Insulation tape 1000 --> Tapes for testing (comparison test) (conventional/special) Lay corrugated pipes on the wall and pull cable pulling aid through corrugated pipes
Performance level: 1st year of apprenticeship
Stand: W20
KAISER GmbH & Co. KG
Topic: The basis of good electrical installation
Tasks: Assembly of innovative KAISER products in electrical installation as well as in the area of connectivity and cable glands
Stand: W06
LEDVANCE GmbH
Topic & Tasks: Rewiring lights to use LED tubes
Stand: W32
Lightcycle Retourlogistik und Service GmbH
Topic: Proper disposal and recycling of old lamps and lights Task: Sort waste into the right containers with the interactive game “Recyclingmaster”
Performance level: 1st year of apprenticeship
Stand: W22
MENNEKES Elektrotechnik GmbH & Co. KG
Topic & Task: Connecting a PowerTOP® XTRA coupling
Performance level: 1st year of apprenticeship
Stand: W10
METREL GmbH
Subject: VDE 0100 EVSE
Task: 1. You are checking a house installation. In a socket circuit, you determine the insulation resistance of 0.75 MΩ. a) OK b) not OK
2. You check the installation and measure a symmetrical load on the phase conductors. How high is the current in the neutral conductor?
3. You measure a voltage of 73V between the neutral conductor and PE on a Schuko socket. What could be the cause of this?
Performance level: 3rd year of apprenticeship
Stand: W12
OBO Bettermann Vertrieb Deutschland GmbH & Co. KG
Topic: Industrial installation, building installation and the myOBO app
Tasks:
Industrial installation: Airtight flush-mounted boxes from the WIN series
In front of you you see a plate with installation openings and slots for cable routing. Use our flush-mounted boxes to create an airtight and thermal bridge-free electrical installation over the entire length of the plate. To do this, select the appropriate flush-mounted box variants from the box next to you.
Building installation: Underfloor complete unit UD Home2
In front of you you see an unequipped UD Home2 complete underfloor unit. First equip the UD Home2 with the carrier plate and then wire the 2-way socket in the UD Home2. Then finish the installation by placing the cover on the UD Home2
The myOBO app is here! The mobile device for electrical installation
With the myOBO app, you have access to the OBO product catalogs anytime, anywhere - even offline, without the Internet. You can create and manage projects, export them, and transfer your desired products directly to the shopping cart of the wholesaler of your choice. The myOBO app is also your direct line to OBO customer service: you can contact us by message or direct call if you need help or have questions. This is how you plan and work smartly! - Let our employees explain the myOBO app to you.
Stand: W60
Rutec Licht GmbH & Co. KG
Topic: Practical tips: LED connector technology & troubleshooting)
Task: 1. LED connector technology: feeders, direct connectors
2. Troubleshooting an RGBwLED strip
3. Soldering technique: Making a 2-pole feed
Performance level: 1st-2nd year of apprenticeship
Stand: W16
Safetytest GmbH
Topic: Testing of electrical work equipment according to DIN EN 50699 (DIN VDE 0702)
Task: Standard-compliant testing of various work equipment, evaluation of test results, documentation
Stand: W38
Schneider Electric GmbH
Thema: 1. Wiser 2. ABN 3. QuickFlex
Overview: 1. From switch to standard electronics to smart home
2. Planning of a multi-family house complex including media and distribution panel
3. Easily connect switches and sockets and test them conveniently with intelligent additional functions
Performance level: 1st-3rd year of apprenticeship
Stand: W08
Siedle S.Siedle & Söhne
Topic: Installation / commissioning of Siedle IP system
Task: Installation and commissioning of digital house telephones and connection with the Siedle app
Stand: W36
Trilux Vertrieb GmbH
Thema: SPEED OF LIGHT
Task: Conversion of conventional lighting to LED in a timed competition
Performance level: 1st year of apprenticeship
Stand: W30
WAGO GmbH & Co. Ltd. KG
Topic: Screwless connection technology for connecting electrical wires and cables
Task: Wiring of a switch-on/off switch, installation floor terminals in the small distribution board, switching off with Winsta-Linect
Performance level: 1st-3rd year of apprenticeship
Stand: W52 & W54
electrical engineering | a trade fair of
Messe Dortmund GmbH
Strobelallee 45
44139 Dortmund
PHONE 49 (0) 231/1204-521
FAX 49 (0) 231/1204-678
data protection
imprint
Cookie-Policy
Newsletter
electrical engineering | a trade fair of
Messe Dortmund GmbH
Strobelallee 45
44139 Dortmund
PHONE 49 (0) 231/1204-521
FAX 49 (0) 231/1204-678
data protection
imprint
Cookie-Policy
Newsletter